Manhole Rehabilitation IBG UV System: Speed, Power, & Precision

The Need for Speed in Manhole Rehabilitation

In the world of trenchless rehabilitation, time is the single most valuable currency. Municipalities demand faster turnaround times to minimize traffic disruption, while contractors need efficient workflows to maximize the number of installations per shift.

As the industry moves away from traditional slow-curing methods, UV (Ultraviolet) curing has become the gold standard for Cured-In-Place Manhole (CIPM) liners. However, not all light trains are created equal. To truly unlock the potential of your crew, you need a system designed specifically for the vertical challenges of manholes.

Introducing the IBG UV System

Our system is engineered with one goal in mind: Optimized Curing Time. By combining high-intensity UV output with intelligent monitoring, we allow you to cure liners faster and move on to the next job sooner.

Whether you are rehabilitating standard municipal manholes or deep industrial shafts, our system scales to your needs.

Technical Specifications & Power

The core of the IBG system is its versatile light source, available in two powerful configurations to match your specific liner thickness and diameter requirements:

  • Standard Configuration: 8 x UV Bulbs (Max 800 Watts) – Perfect for uniform, rapid curing of standard manholes.

  • High-Performance Configuration: 4 x UV Bulbs (4 x 1,500 Watts) – Delivers intense penetration for thicker structural liners or larger diameters.

Total Control: The Mobile Unit

Power is nothing without control. The IBG system includes a Mobile Control Unit designed for the modern job site. It features our proprietary Manhole Software, which takes the guesswork out of the cure.

  • Data Logging: Automatically records all critical parameters (speed, temperature, intensity) to provide a verifiable quality report for your clients.

  • Integrated Camera: Gives the operator a real-time, 360-degree view of the liner during inflation and curing.

Built for the Field

We understand the realities of the job site. That is why the system comes as a complete Accessories Package ready for deployment:

  • Specialized Hose Reel: Includes 25 meters of cable standard (with longer lengths available on request) to reach deep assets.

  • Packer System: Ensures a perfect seal and fitment every time.

Take Your Rehabilitation Projects to the Next Level

Don't let outdated curing technology slow down your operations. The IBG UV System is designed to help you bid more competitively and finish jobs faster.

For a complete overview of our technologies, technical data sheets, and to find the right solution for your next project, visit our dedicated platform at www.manhole-rehabilitation.com.

Back to blog